5 June 2005 -
TEN MONTHS since the start of the works
(August 2004) and: only the side of the
steps has been painted; the base slats can
be seen in the main entrance |

3 July 2005 -
No progress has been made on the stairs over
a one month period. (Flooring has been placed
in the entrance and covered with cardboard) |

7 August 2005 -
For MORE THAN TWO MONTHS, no progress has been
made on the stairs. (The main entrance is in
the same state as one month ago) |

20 September
2005 -
An underlay has been placed on
the steps. Note that it is now MORE THAN ONE
YEAR since the start of the works (August 2004) |

20 September
2005 -
Some underlay has been placed on the steps.
Note that the floor in the corridor leading
to my flat is still bare - MORE THAN ONE
YEAR after the start of the works |

3 October 2005 -
TWO WEEKS since the underlay was placed on
the stairs. No progress has been made since.
As can be seen, the underlay is coming apart
and is proving a health and safety risk |